|      1-Funded Research Projects : ·        
    Design of a Pilot Plant
    for Producing Gas Hydrates (Khorasan Gas Corporation). ·        
    Energy Policy Project
    in Khorasan (Khorasan Gas Corporation). 
     Dynamic
         Simulation of Iranian Fourth Region Gas Transmission Pipelines (Fourth
         Region Gas Transmission Corporation).Increasing
         the Capacity of Bid-Boland refinery      2-Selected Research Project : ·        
    Simulation and
    Optimization of Topping Unit in Khangiran Gas
    Refinery. ·        
    Nonlinear Control of a Fedbatch Bioreactor. ·        
    Control of Bioreactor
    Based on Population Balance Model. ·        
    Tuning and
    Implementation of PID Controller Based on Neural Networks Models. ·        
    Modeling and Control of
    a Steam- Methane Reforming reactor. ·        
    The Best Structure and
    Control of Batch Distillation Columns. ·        
    Control Structure of
    two Thermally Coupled Distillation Columns. ·        
    The Modeling of Natural
    Gas Demand in Khorasan. ·        
    Thermodynamic and
    Kinetic Modeling of Natural Gas Hydrates. ·        
    Bioethanol Production From Waste Wood. ·        
    Modeling and Control of
    Packed- Bed Solid- State Bioreactors.   |